129667634782021642_16CNR issues motor car factory has been restored because of quality extensions
Last night, CNR announcement said its subsidiary holding shares of newly-built CRH380BL-EMU receives notification of the Ministry of railways, restoring factory acceptance. It is understood that long shares this year's delivery plan-CRH380BL there are still 17 column in EMU has not been delivered, covering the contract value is approximately 6.7 billion yuan. Last night, the head of China North locomotive and related tablesAs shown, does not affect 17 emus delivered during the year, annual management goal long shares will not be affected. After the Beijing-Shanghai high-speed railway opened, long shares of production CRH380BL EMU series hot box alarm, automatic reduction of false positives with a bow, traction loss, failure
swtor power leveling, these failures are caused by the subcontractors accessory is not eligible, at the operation site is difficult to quickly troubleshoot and-Effect rectification and reform. To this end, China North locomotive and proposed to the Ministry to suspend delivery planning requirements of the motor car. On August 12, the announcement made by the CNR
Diablo 3 Power Leveling, recalling 54 large-CRH380BL that has been put into operation the EMU, qualified for rectification and reform, and then returned. On November 14, the Ministry said, CNR CRH380BL EMU to recall has carried out serious rectification and reform,, Test-proven, third-party assessment and expert review, confirmed that the rectification and reform passed since November 16 batches put into operation.
No comments:
Post a Comment